A THERMAL POWER PLANT PROJECT
QUESTIONNAIRE
Sub: MW Thermal Power Plant Project in
I. GENERAL INFORMATION OF CUSTOMER:
A. Brief Company Background
|
Company Name
|
|
|
Contact person/method
|
|
|
Industry Type
|
|
|
Existing Factory Production Capacity
|
|
|
Power Source
|
|
|
Existing Self-owned Power Plant Capacity
|
|
|
Power Shortage for Production
|
|
|
Other Problems needs to be solved
|
|
II. Specific Information On The Plant Required
A. General Information
|
Project Characteristic
|
□ Private Project
□ Public Project
|
□ New Plant
□ Expansion Plant
|
|
Possibility of future expansion
|
|
|
Purpose of Power Plant
|
□ Self-owned power supply station
□ Other, to be specified:
|
|
Project Award Method
|
□ EPC without civil works
□ Total supply of equipments
□ Other, to be specified:
|
|
Project Expected Schedule
|
Finalization of the contract: months
Completion of the power plant: months
|
|
Project and relative license
|
□ Confirmed
□ Processing
|
|
Project bidding status
|
|
|
Potential competitors
|
|
B. Requirement Details for Proposed Power Plant
|
Proposed Power Plant:
|
Capacity: MW
Codes/Standards required:
|
|
Boiler:
|
Type:
Capacity (t/h):
Steam Pressure (Mpa):
Steam Temperature (℃):
Feed Water Temperature (℃):
|
|
Turbine:
|
Type:
Output Requirement (MW):
Exhaust Pressure (MPa):
Rotation Speed (rpm)
Process Steam Requirement (if any)
Quantity (t/h):
Pressure (MPa):
Temperature (℃):
|
|
Generator:
|
Output Requirement (MW):
Output Voltage (KV):
Frequency (Hz):
Excitation Type:
Power Factor:
|
|
Emission Requirement:
|
Flue Gas (ppm):
Particles:
NOx:
SOx:
COx:
Waste Water:
|
|
Owner’s Brand Preference for Main Equipment:
|
Chinese Product:
Others (Please Specify):
|
|
Other Special Requirement (Please Specify):
|
|
III. Desired Scope of Supply
A. Civil Work: □ Included □Excluded
B. Installation And Commissioning: □ Included □Excluded
C. Boiler And Auxiliary Equipment: □ Included □Excluded
D. Turbine And Auxiliary Equipment: □ Included □Excluded
E. Generator And Auxiliary Equipment: □ Included □Excluded
F. Fuel Handling System: □ Included □Excluded
G. Chemical Water (Treatment) System: □ Included □Excluded
H. Electrical System: □ Included □Excluded
I. Control And Instrumentation System: □ Included □Excluded
J. Cooling Water System: □ Included □Excluded
IV. Information Needed From the Owner
A. Site Information:
|
Location:
|
Latitude:
|
|
Longitude:
|
|
Site Layout (if available):
|
|
|
Site Conditions (please attach the reports concerned):
|
Meteorological Condition Temp:
Topographical Condition Humidity:
Geological Condition
|
|
Distances of fuel, power, water, etc, from the site:
|
Fuel:
Power:
Water:
Other (Please Specify):
|
|
Distance to Consumption Points:
|
Proposed Plant ~ End User:
Proposed Plant ~National Grid:
|
|
Information on the existing system (if the expansion project is applied):
|
Layout of the existing plant:
Thermal system information:
Existing Water Treatment System:
Factory Existing Electricity Single Line Diagram:
Other Systems (Please Specify):
|
B. Fuel Specification (please attach analysis report if available):
|
Type:
|
|
|
LHV (Kcal):
|
|
|
Carbon Content (%):
|
|
|
Volatile Content (%):
|
|
|
Sulfur Content (%):
|
|
|
Ash content (%):
|
|
|
Moisture (%):
|
|
|
Coal particle size(mm):
|
|
C. Raw Water Analysis (please attach analysis report if available):
|
Hardness:
|
|
|
PH Value:
|
|
|
Conductivity:
|
|
|
Temperature:
|
|
|
Pressure:
|
|
|
Total Alkalinity:
|
|
|
Total Dissolved Oxygen:
|
|
|
Ca/Mg/S/Cl/Fe/Si/O2 Content:
|
|
V. Financial Data & Conditions
|
Proposed Source of Financing:
|
|
|
Proposed Capital Investment on The Project and Estimated Cost of Equipment/Accessories for Budgeting Purposes:
|
|
|
Banking reference:
|
|
|
Other relevant information on customer's financial position:
|
|
|
Buyer’s Credit/Supplier’s Credit
|
□ Yes, need. (please specify in detail)
□ No.
|
|